Worksheet utilized to track installation of electric valves in the field.  This material is then conveyed to the Irrigation Consultant and TPCA representatives which is then downloaded into the central control system at the irrigation pump house.
Newer Post Older Post Home

Blog Archive

  • ►  2012 (3)
    • ►  May (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2011 (43)
    • ►  December (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (1)
    • ►  April (3)
    • ►  March (7)
    • ►  February (20)
    • ►  January (2)
  • ▼  2010 (80)
    • ▼  December (9)
      • Distribution uniformity test performed on number 1...
      • As part of the DU test, this unit measures the amo...
      • Distribution uniformity test performed on number 1...
      • Distribution uniformity test was performed on numb...
      • Components of the old common grounds irrigation sy...
      • Worksheet utilized to track installation of electr...
      • Electric valves that will control irrigation heads...
      • Pipe fusion along Timber Pines Blvd.
      • Irrigation Mainline "pipe pulling" installation ...
    • ►  November (4)
    • ►  October (13)
    • ►  September (19)
    • ►  August (25)
    • ►  July (10)
Picture Window theme. Theme images by michaelmjc. Powered by Blogger.