Timber Pines Irrigation Renovation

Pages

  • Home
  • Phase 3 Schedule
  • AquaTurf Site Visits
  • Timber Pines Team
  • DU% Audit

Friday, December 17, 2010

Distribution uniformity test performed on number 11 tee of the Lakes course on December 17th, 2010.  This test covered 3 locations and began at 6am and was completed at 9am. 
Newer Post Older Post Home

Blog Archive

  • ►  2012 (3)
    • ►  May (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2011 (43)
    • ►  December (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (1)
    • ►  April (3)
    • ►  March (7)
    • ►  February (20)
    • ►  January (2)
  • ▼  2010 (80)
    • ▼  December (9)
      • Distribution uniformity test performed on number 1...
      • As part of the DU test, this unit measures the amo...
      • Distribution uniformity test performed on number 1...
      • Distribution uniformity test was performed on numb...
      • Components of the old common grounds irrigation sy...
      • Worksheet utilized to track installation of electr...
      • Electric valves that will control irrigation heads...
      • Pipe fusion along Timber Pines Blvd.
      • Irrigation Mainline "pipe pulling" installation ...
    • ►  November (4)
    • ►  October (13)
    • ►  September (19)
    • ►  August (25)
    • ►  July (10)
Picture Window theme. Theme images by michaelmjc. Powered by Blogger.