Distribution uniformity test performed on number 11 tee of the Lakes course on December 17th, 2010. This test covered 3 locations and began at 6am and was completed at 9am.
As part of the DU test, this unit measures the amount of water applied within an established period of time.
Distribution uniformity test performed on number 11 green of the Lakes course on December 17th, 2010. Once data is compiled this test will help measure the efficiency of the new irrigation system.
Distribution uniformity test was performed on number 11 fairway of the Lakes course on December 17th, 2010.
Components of the old common grounds irrigation system along Timber Pines Blvd. In this case, system degradation was the biggest concern.
Worksheet utilized to track installation of electric valves in the field. This material is then conveyed to the Irrigation Consultant and TPCA representatives which is then downloaded into the central control system at the irrigation pump house.
Electric valves that will control irrigation heads along Timber Pines Blvd. Please note the attention to details during installation.
Pipe fusion along Timber Pines Blvd.
Irrigation Mainline "pipe pulling" installation along Timber Pines Blvd. This process reduces damage to existing St. Augustine.