Monday, October 11, 2010

This flow graph represents an evening irrigation cycle for the old system.  Please note the peaks and valleys in this graph which reflects inefficient watering.  The spikes you see also represent wear and tear on the irrigation pumphouse motors.
Newer Post Older Post Home

Blog Archive

  • ►  2012 (3)
    • ►  May (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2011 (43)
    • ►  December (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (1)
    • ►  April (3)
    • ►  March (7)
    • ►  February (20)
    • ►  January (2)
  • ▼  2010 (80)
    • ►  December (9)
    • ►  November (4)
    • ▼  October (13)
      • Areas impacted by mainline installation were resto...
      • 20 inch mainline installation adjacent to Grandfat...
      • 20 inch mainline bore completed adjacent to irriga...
      • Boring and fusing of 20 inch mainline.
      • Auger utilized during 20 inch mainline bore.
      • 20 inch mainline boring begins adjacent to pumphouse.
      • This flow graph represents an evening irrigation c...
      • This flow graph represents an evening irrigation c...
      • We are currently using 2 irrigation central comput...
      • Installation of 20 inch mainline valve.
      • Fusion of 20 inch mainline begins on hole # 14 of ...
      • Installation begins of 20 inch mainline for new ir...
      • Pink flags denote location of existing 20 inch mai...
    • ►  September (19)
    • ►  August (25)
    • ►  July (10)
Picture Window theme. Theme images by michaelmjc. Powered by Blogger.