Timber Pines Irrigation Renovation

Pages

  • Home
  • Phase 3 Schedule
  • AquaTurf Site Visits
  • Timber Pines Team
  • DU% Audit

Friday, October 22, 2010

20 inch mainline boring begins adjacent to pumphouse.
Newer Post Older Post Home

Blog Archive

  • ►  2012 (3)
    • ►  May (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2011 (43)
    • ►  December (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (1)
    • ►  April (3)
    • ►  March (7)
    • ►  February (20)
    • ►  January (2)
  • ▼  2010 (80)
    • ►  December (9)
    • ►  November (4)
    • ▼  October (13)
      • Areas impacted by mainline installation were resto...
      • 20 inch mainline installation adjacent to Grandfat...
      • 20 inch mainline bore completed adjacent to irriga...
      • Boring and fusing of 20 inch mainline.
      • Auger utilized during 20 inch mainline bore.
      • 20 inch mainline boring begins adjacent to pumphouse.
      • This flow graph represents an evening irrigation c...
      • This flow graph represents an evening irrigation c...
      • We are currently using 2 irrigation central comput...
      • Installation of 20 inch mainline valve.
      • Fusion of 20 inch mainline begins on hole # 14 of ...
      • Installation begins of 20 inch mainline for new ir...
      • Pink flags denote location of existing 20 inch mai...
    • ►  September (19)
    • ►  August (25)
    • ►  July (10)
Picture Window theme. Theme images by michaelmjc. Powered by Blogger.