Timber Pines Irrigation Renovation
Pages
Home
Phase 3 Schedule
AquaTurf Site Visits
Timber Pines Team
DU% Audit
Monday, May 21, 2012
MRI is underway on the back 9 of the Grand Pines. These are some photos of the project underway on #10.
Trenching the 10" Main line on #10.
10" main line valve coming from #18.
Pulled the 1-1/2" line around the tee boxes.
Older Post
Home