Timber Pines Irrigation Renovation

Pages

  • Home
  • Phase 3 Schedule
  • AquaTurf Site Visits
  • Timber Pines Team
  • DU% Audit

Friday, July 30, 2010


Mainline fusion begins on hole #1 of the Lakes course as the first step of the irrigation renovation.
Newer Post Older Post Home

Blog Archive

  • ►  2012 (3)
    • ►  May (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2011 (43)
    • ►  December (1)
    • ►  October (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (2)
    • ►  May (1)
    • ►  April (3)
    • ►  March (7)
    • ►  February (20)
    • ►  January (2)
  • ▼  2010 (80)
    • ►  December (9)
    • ►  November (4)
    • ►  October (13)
    • ►  September (19)
    • ►  August (25)
    • ▼  July (10)
      • In an effort to provide quality control for irriga...
      • Timber Pines staff members receive HDPE fusion tra...
      • Mainline fusion begins on hole #1 of the Lakes cou...
      • Additional HDPE fusion training provided by Doug Zak.
      • Doug Zak with CMF Distribution provides training a...
      • Some of the tools being utilized during the irriga...
      • Timber Pines staff receiving RainBird Integrated ...
      • First Load of HDPE Pipe Hits the Ground!
      • RainBird Integrated Control System page 2.
      • RainBird Integrated Control System page 1.
Picture Window theme. Theme images by michaelmjc. Powered by Blogger.