On January 24th, 2011 we began one of the most vital processes within the installation of the new irrigation system which included removal of some of the old existing main-line pipe, HDPE pipe fusion with valves and additional installation of the RainBird IC system wirepaths which gives us “central control”. The 2700 feet of the new 20’’ mainline had already been installed during phase 1 golf on the Lakes course and it was now time to completely connect the new mainline to the renovated system and parts of our existing old irrigation. For this to be completed we needed to impact # 1 of the Hills course and the area adjacent to the Irrigation Pumphouse. As of 2/3/11 all installation of the manifold and mainline tie ins was completed and the overall system was tested over the weekend with very positive results. Once again I appreciate the Members patience during this time and below are some of the photos which reflect the scope of work and what was accomplished. Considering the magnitude of this installation I’d like to say job well done to the TPCA employees and Mike Roach Inc.staff.